COOLING WATER TREATMENT PLANT IN A STEEL MILL – PROJECT IN DUISBURG BRUCKHAUSEN, GERMANY

COOLING WATER TREATMENT PLANT IN A STEEL MILL – PROJECT IN DUISBURG BRUCKHAUSEN, GERMANY

At the Duisburg Bruckhausen site, thyssenkrupp Steel Europe AG (tkSE) has been operating a water treatment system (WaWi) since 1999 to cool the existing continuous casting and rolling mill (GWA).

As part of the 20-30 Strategy, the existing CSP plant was converted in 2026 into Continuous Casting Line 4 (SGA4) with a downstream Hot Strip Mill 4 (WBW4). Furthermore, two new walking-beam furnaces (HBÖ) were erected and integrated into the process. The water treatment system was also required to supply cooling water to a further continuous casting plant (SGA3).

To achieve this, it was necessary to adapt the existing water treatment plant to the new water flow rates, temperatures and other requirements.

As part of this, the three cooling circuits (A, B, C) were expanded to accommodate the new water flow rates: Circuit A 10,500 m³/h, Circuit B 6,725 m³/h, Circuit C 10,200 m³/h.

The scope of supply included the basic and detailed design, the supply of mechanical and electrical equipment (various new pumping stations, two new concrete cooling towers, modification of the dosing system, etc.), the upgrading of the switchgear, the replacement of the entire control system, and the installation and commissioning of the plant.

THE TECHNICAL DATA OF THE PLANT

ParameterWert
Kreislauf A10.500 m³/h
Kreislauf B6.725 m³/h
Kreislauf C10.200 m³/h
KühltürmeTwo new cooling tower cells with a total capacity of 5,500 m³/h
Pumpstationen6 new pumping stations with a total of 23 new pumps of different capacities
FilterstationExpansion of the filtration system with new gravel filters, each 5 m in diameter
DosierungExpansion of the dosing stations
SwitchgearExpansion with new switchgear cabinets
InstrumentationDelivery of all necessary new measuring instruments
AutomationDelivery of a new control and automation system for the entire plant
CablingDelivery of the complete cabling
Installation workComplete installation of the mechanical and electrical components