{"id":15541,"date":"2025-01-27T11:09:42","date_gmt":"2025-01-27T11:09:42","guid":{"rendered":"https:\/\/pse-eng.de\/?p=15541"},"modified":"2026-11-04T10:11:32","modified_gmt":"2026-11-04T10:11:32","slug":"solanlage-projekt-in-deutschland-jemgum","status":"publish","type":"post","link":"https:\/\/pse-eng.de\/en\/speicher-transport-produktion-explorationstechnik\/solanlage-projekt-in-deutschland-jemgum\/","title":{"rendered":"BRINE PLANT \u2013 PROJECT IN GERMANY, JEMGUM\u00a0"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The customer operates an underground storage facility for natural gas at the Jemgum site. For the soling of eight salt caverns on three cavern collection points, a brine facility including a fresh water extraction structure was built on the Ems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The planning and construction included the entire building and station infrastructure for the brine plant with the necessary auxiliary and ancillary systems. These include the main brine pumps, brine transport pumps including low-volume pumps, nitrogen blanket system, brine settling tanks, brine transport lines, MV\/LV switchgear and process control system.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"276\" height=\"185\" src=\"https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/ve.png\" alt=\"\" class=\"wp-image-15542\" style=\"width:700px\" srcset=\"https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/ve.png 276w, https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/ve-18x12.png 18w\" sizes=\"(max-width: 276px) 100vw, 276px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the project, PSE was commissioned with project management, planning, as well as construction and commissioning supervision.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">THE TECHNICAL DATA OF THE PLANT<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Solanlage<\/th><th>Wert<\/th><\/tr><\/thead><tbody><tr><td><strong>Pumpeneinheiten<\/strong><\/td><td>6<\/td><\/tr><tr><td><strong>Gesamtf\u00f6rdermenge<\/strong><\/td><td>80 bis 320 m\u00b3\/h<\/td><\/tr><tr><td><strong>Betriebsdruck<\/strong><\/td><td>50 bis 170 barg<\/td><\/tr><tr><td><strong>Anschlussleistung<\/strong><\/td><td>6 \u00d7 1 MW<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Soletransportsystem<\/th><th>Wert<\/th><\/tr><\/thead><tbody><tr><td><strong>Pumpeneinheiten<\/strong><\/td><td>3<\/td><\/tr><tr><td><strong>Gesamtf\u00f6rdermenge<\/strong><\/td><td>200 bis 850 m\u00b3\/h<\/td><\/tr><tr><td><strong>Betriebsdruck<\/strong><\/td><td>15 bis 25 barg<\/td><\/tr><tr><td><strong>Anschlussleistung<\/strong><\/td><td>3 \u00d7 800 kW<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Mindermengensoletransportsystem<\/th><th>Wert<\/th><\/tr><\/thead><tbody><tr><td><strong>Pumpeneinheit<\/strong><\/td><td>1<\/td><\/tr><tr><td><strong>Gesamtf\u00f6rdermenge<\/strong><\/td><td>80 bis 300 m\u00b3\/h<\/td><\/tr><tr><td><strong>Betriebsdruck<\/strong><\/td><td>15 bis 25 barg<\/td><\/tr><tr><td><strong>Anschlussleistung<\/strong><\/td><td>1 \u00d7 300 kW<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Blanketanlage<\/th><th>Wert<\/th><\/tr><\/thead><tbody><tr><td><strong>Stickstoff<\/strong><\/td><td>2.000 Nm\u00b3\/h<\/td><\/tr><tr><td><strong>Betriebsdruck<\/strong><\/td><td>150 bis 170 barg<\/td><\/tr><tr><td><strong>Anschlussleistung<\/strong><\/td><td>24 kW<\/td><\/tr><\/tbody><\/table><\/figure>","protected":false},"excerpt":{"rendered":"<p>Der Kunde betreibt am Standort Jemgum einen Untergrundspeicher f\u00fcr Erdgas. F\u00fcr die&nbsp;Solung&nbsp;von acht Salzkavernen auf drei Kavernensammelpl\u00e4tzen wurde eine&nbsp;Solanlage&nbsp;inkl. Frischwasserentnahmebauwerk an der Ems errichtet. Die Planung und Errichtung umfasste die gesamte Geb\u00e4ude- und Stationsinfrastruktur f\u00fcr die Solanlage mit den notwendigen Hilfs- und Nebensystemen. Hierzu geh\u00f6ren die Hauptsolpumpen, Soletransportpumpen inkl. Mindermengenpumpe, Stickstoff-Blanketanlage, Soleabsetzbecken, Soletransportleitungen, MS-\/NS-Schaltanlagen und [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":15542,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-15541","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-speicher-transport-produktion-explorationstechnik"],"_links":{"self":[{"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/posts\/15541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/comments?post=15541"}],"version-history":[{"count":1,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/posts\/15541\/revisions"}],"predecessor-version":[{"id":16619,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/posts\/15541\/revisions\/16619"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/media\/15542"}],"wp:attachment":[{"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/media?parent=15541"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/categories?post=15541"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/tags?post=15541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}