{"id":15518,"date":"2025-01-27T10:46:29","date_gmt":"2025-01-27T10:46:29","guid":{"rendered":"https:\/\/pse-eng.de\/?p=15518"},"modified":"2025-06-13T07:02:21","modified_gmt":"2025-06-13T07:02:21","slug":"erdgas-untergrundspeicher-projekt-in-deutschland-etzel","status":"publish","type":"post","link":"https:\/\/pse-eng.de\/en\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/","title":{"rendered":"UNDERGROUND NATURAL GAS STORAGE \u2013 PROJECT IN GERMANY, ETZEL\u00a0"},"content":{"rendered":"<p>Storing natural gas in underground salt caverns is an essential part of security of supply. To minimise the probability of failure and increase redundancy, two withdrawal rods including the hot water supply have been planned and built. In the course of this, the withdrawal capacity of the existing plant was increased to 2x 60% and the existing line was dismantled. The renovation took place during ongoing operations.<\/p>\n\n\n\n<p>The withdrawal trains can be operated in parallel as well as in individual operation. In the withdrawal operation, the natural gas is fed via the separators to the shell-and-tube heat exchangers for the preheating. The pressure is then reduced to the pressure level of the gas drying by means of pressure reduction and flow control valves. The required amount of heat is provided in the primary heating circuit by a boiler system and transported to the heat exchangers via a hydraulic diverter by secondary circulation pumps.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"356\" height=\"242\" src=\"https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/34.png\" alt=\"\" class=\"wp-image-15519\" style=\"width:700px\" srcset=\"https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/34.png 356w, https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/34-300x204.png 300w, https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/34-18x12.png 18w\" sizes=\"(max-width: 356px) 100vw, 356px\" \/><\/figure>\n\n\n\n<p>As part of the project, PSE was assigned for the project management, planning as well as the construction and commissioning management.<\/p>\n\n\n\n<p>The planning and construction of the withdrawal train included the entire station infrastructure for the withdrawal trains with the necessary auxiliary and ancillary systems. These include the separators, heat exchangers, pressure\/volume control, preheating with secondary circulation pumps and hydraulic diverter.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">THE TECHNICAL DATA OF THE PLANT<\/h2>\n\n\n\n<p>Withdrawal train 1 and 2:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>25,000 to 1,100.000 Nm\u00b3\/h Total withdrawal rate<\/strong><\/li>\n\n\n\n<li><strong>110 to 199 barg Operating pressure<\/strong><\/li>\n\n\n\n<li><strong>8.8 MW Total thermal duty<\/strong><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Das Speichern von Erdgas in untert\u00e4gigen Salzkavernen ist ein wesentlicher Bestandteil der Versorgungssicherheit. Zur Minimierung der Ausfallwahrscheinlichkeit und Erh\u00f6hung der Redundanz sind zwei&nbsp;Ausspeicherst\u00e4nge&nbsp;inkl. der Warmwasserversorgung geplant und errichtet worden. In dem Zuge wurde die Ausspeicherkapazit\u00e4t der Bestandsanlage auf 2x 60% erh\u00f6ht und der bestehende Strang zur\u00fcckgebaut. Der Umbau hat w\u00e4hrend des laufenden Betriebs stattgefunden. Die [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":15519,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-15518","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-speicher-transport-produktion-explorationstechnik"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ERDGAS-UNTERGRUNDSPEICHER\u00a0- PROJEKT IN DEUTSCHLAND, ETZEL\u00a0 - PSE ENGINEERING GmbH<\/title>\n<meta name=\"robots\" content=\"noindex, follow\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ERDGAS-UNTERGRUNDSPEICHER\u00a0- PROJEKT IN DEUTSCHLAND, ETZEL\u00a0 - PSE ENGINEERING GmbH\" \/>\n<meta property=\"og:description\" content=\"Das Speichern von Erdgas in untert\u00e4gigen Salzkavernen ist ein wesentlicher Bestandteil der Versorgungssicherheit. Zur Minimierung der Ausfallwahrscheinlichkeit und Erh\u00f6hung der Redundanz sind zwei&nbsp;Ausspeicherst\u00e4nge&nbsp;inkl. der Warmwasserversorgung geplant und errichtet worden. In dem Zuge wurde die Ausspeicherkapazit\u00e4t der Bestandsanlage auf 2x 60% erh\u00f6ht und der bestehende Strang zur\u00fcckgebaut. Der Umbau hat w\u00e4hrend des laufenden Betriebs stattgefunden. Die [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/\" \/>\n<meta property=\"og:site_name\" content=\"PSE ENGINEERING GmbH\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-27T10:46:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-13T07:02:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/wp-content\/uploads\/2025\/01\/34.png\" \/>\n\t<meta property=\"og:image:width\" content=\"356\" \/>\n\t<meta property=\"og:image:height\" content=\"242\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"wpadmin_local\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/\"},\"author\":{\"name\":\"wpadmin_local\",\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/#\\\/schema\\\/person\\\/681432291044d0c835c44d38b2b74c33\"},\"headline\":\"ERDGAS-UNTERGRUNDSPEICHER\u00a0&#8211; PROJEKT IN DEUTSCHLAND, ETZEL\u00a0\",\"datePublished\":\"2025-01-27T10:46:29+00:00\",\"dateModified\":\"2025-06-13T07:02:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/\"},\"wordCount\":224,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pse-eng.de\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/34.png\",\"articleSection\":[\"SPEICHER - TRANSPORT - PRODUKTION - EXPLORATIONSTECHNIK\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/\",\"url\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/\",\"name\":\"ERDGAS-UNTERGRUNDSPEICHER\u00a0- PROJEKT IN DEUTSCHLAND, ETZEL\u00a0 - PSE ENGINEERING GmbH\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pse-eng.de\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/34.png\",\"datePublished\":\"2025-01-27T10:46:29+00:00\",\"dateModified\":\"2025-06-13T07:02:21+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/#\\\/schema\\\/person\\\/681432291044d0c835c44d38b2b74c33\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/#primaryimage\",\"url\":\"https:\\\/\\\/pse-eng.de\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/34.png\",\"contentUrl\":\"https:\\\/\\\/pse-eng.de\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/34.png\",\"width\":356,\"height\":242},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/speicher-transport-produktion-explorationstechnik\\\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Start\",\"item\":\"https:\\\/\\\/pse-eng.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERDGAS-UNTERGRUNDSPEICHER\u00a0&#8211; PROJEKT IN DEUTSCHLAND, ETZEL\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/#website\",\"url\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/\",\"name\":\"PSE ENGINEERING GmbH\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/wwwpse-engde-mqm2bws8w6.live-website.com\\\/#\\\/schema\\\/person\\\/681432291044d0c835c44d38b2b74c33\",\"name\":\"wpadmin_local\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ea5342fa48f5e9339bde227caf3ba685afd39a7ad861482751abf6e6ef3526c5?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ea5342fa48f5e9339bde227caf3ba685afd39a7ad861482751abf6e6ef3526c5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ea5342fa48f5e9339bde227caf3ba685afd39a7ad861482751abf6e6ef3526c5?s=96&d=mm&r=g\",\"caption\":\"wpadmin_local\"},\"url\":\"https:\\\/\\\/pse-eng.de\\\/en\\\/author\\\/wpadmin_local\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ERDGAS-UNTERGRUNDSPEICHER\u00a0- PROJEKT IN DEUTSCHLAND, ETZEL\u00a0 - PSE ENGINEERING GmbH","robots":{"index":"noindex","follow":"follow"},"og_locale":"en_GB","og_type":"article","og_title":"ERDGAS-UNTERGRUNDSPEICHER\u00a0- PROJEKT IN DEUTSCHLAND, ETZEL\u00a0 - PSE ENGINEERING GmbH","og_description":"Das Speichern von Erdgas in untert\u00e4gigen Salzkavernen ist ein wesentlicher Bestandteil der Versorgungssicherheit. Zur Minimierung der Ausfallwahrscheinlichkeit und Erh\u00f6hung der Redundanz sind zwei&nbsp;Ausspeicherst\u00e4nge&nbsp;inkl. der Warmwasserversorgung geplant und errichtet worden. In dem Zuge wurde die Ausspeicherkapazit\u00e4t der Bestandsanlage auf 2x 60% erh\u00f6ht und der bestehende Strang zur\u00fcckgebaut. Der Umbau hat w\u00e4hrend des laufenden Betriebs stattgefunden. Die [&hellip;]","og_url":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/","og_site_name":"PSE ENGINEERING GmbH","article_published_time":"2025-01-27T10:46:29+00:00","article_modified_time":"2025-06-13T07:02:21+00:00","og_image":[{"width":356,"height":242,"url":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/wp-content\/uploads\/2025\/01\/34.png","type":"image\/png"}],"author":"wpadmin_local","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/#article","isPartOf":{"@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/"},"author":{"name":"wpadmin_local","@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/#\/schema\/person\/681432291044d0c835c44d38b2b74c33"},"headline":"ERDGAS-UNTERGRUNDSPEICHER\u00a0&#8211; PROJEKT IN DEUTSCHLAND, ETZEL\u00a0","datePublished":"2025-01-27T10:46:29+00:00","dateModified":"2025-06-13T07:02:21+00:00","mainEntityOfPage":{"@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/"},"wordCount":224,"commentCount":0,"image":{"@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/#primaryimage"},"thumbnailUrl":"https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/34.png","articleSection":["SPEICHER - TRANSPORT - PRODUKTION - EXPLORATIONSTECHNIK"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/","url":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/","name":"ERDGAS-UNTERGRUNDSPEICHER\u00a0- PROJEKT IN DEUTSCHLAND, ETZEL\u00a0 - PSE ENGINEERING GmbH","isPartOf":{"@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/#primaryimage"},"image":{"@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/#primaryimage"},"thumbnailUrl":"https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/34.png","datePublished":"2025-01-27T10:46:29+00:00","dateModified":"2025-06-13T07:02:21+00:00","author":{"@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/#\/schema\/person\/681432291044d0c835c44d38b2b74c33"},"breadcrumb":{"@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/#primaryimage","url":"https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/34.png","contentUrl":"https:\/\/pse-eng.de\/wp-content\/uploads\/2025\/01\/34.png","width":356,"height":242},{"@type":"BreadcrumbList","@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/speicher-transport-produktion-explorationstechnik\/erdgas-untergrundspeicher-projekt-in-deutschland-etzel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Start","item":"https:\/\/pse-eng.de\/"},{"@type":"ListItem","position":2,"name":"ERDGAS-UNTERGRUNDSPEICHER\u00a0&#8211; PROJEKT IN DEUTSCHLAND, ETZEL\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/#website","url":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/","name":"PSE ENGINEERING GmbH","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/wwwpse-engde-mqm2bws8w6.live-website.com\/#\/schema\/person\/681432291044d0c835c44d38b2b74c33","name":"wpadmin_local","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/ea5342fa48f5e9339bde227caf3ba685afd39a7ad861482751abf6e6ef3526c5?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ea5342fa48f5e9339bde227caf3ba685afd39a7ad861482751abf6e6ef3526c5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ea5342fa48f5e9339bde227caf3ba685afd39a7ad861482751abf6e6ef3526c5?s=96&d=mm&r=g","caption":"wpadmin_local"},"url":"https:\/\/pse-eng.de\/en\/author\/wpadmin_local\/"}]}},"_links":{"self":[{"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/posts\/15518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/comments?post=15518"}],"version-history":[{"count":0,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/posts\/15518\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/media\/15519"}],"wp:attachment":[{"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/media?parent=15518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/categories?post=15518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pse-eng.de\/en\/wp-json\/wp\/v2\/tags?post=15518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}