SOLAR PLANT – PROJECT IN GERMANY, JEMGUM 

The customer operates an underground storage facility for natural gas at the Jemgum site. For the soling of eight salt caverns on three cavern collection points, a brine facility including a fresh water extraction structure was built on the Ems.

The planning and construction included the entire building and station infrastructure for the brine plant with the necessary auxiliary and ancillary systems. These include the main brine pumps, brine transport pumps including low-volume pumps, nitrogen blanket system, brine settling tanks, brine transport lines, MV/LV switchgear and process control system.

As part of the project, PSE was commissioned with project management, planning, as well as construction and commissioning supervision.

THE TECHNICAL DATA OF THE PLANT

Brine Plant

  • 6 pump units
  • 80 to 320 m³/h Total flow rate
  • 50 to 170 barg Operating pressure
  • 6x 1 MW Power consumption

Brine transport system:

  • 3 Pump units
  • 200 to 850 m³/h Total flow rate
  • 15 to 25 barg Operating pressure
  • 3x 800 kW Power consumption

Minimum load brine transport system

  • 1 Pump unit
  • 80 to 300 m³/h Flow rate
  • 15 to 25 barg Operating pressure
  • 1x 300 kW Power consumption

Blanketing System:

  • 2,000 Nm³/h Nitrogen
  • 150 to 170 barg Operating pressure
  • 24 kW Power consumption