NATURAL GAS GATHERING STATION – PROJECT IN NORTHERN GERMANY

Our client, a major company in the energy and resource extraction sector, planned the expansion of its natural gas infrastructure at a strategically advantageous location in northern Germany. The region is known for its well-developed natural gas extraction and offers an ideal geographical position to efficiently inject natural gas into the national supply network. Situated in an area with existing gas infrastructure, the location allows for optimal connection to main supply pipelines and contributes to energy supply security.

Here, we optimized the efficiency of gas extraction and regulated the injected gas volume. The scope of work included planning, engineering, procurement, packaging, assembly, commissioning, and documentation of the facility. Due to the specific requirements, the compressor was designed as a lubricated machine for sour gas processing and equipped with a suction valve unloading system and a variable-speed electric motor for precise flow rate control.
This project plays a crucial role in optimizing gas extraction and distribution, enhancing the efficiency of the natural gas infrastructure, and making a significant contribution to long-term energy supply security.

THE TECHNICAL DATA OF THE PLANT

  • SUCTION PRESSURE: 4 barg
    The suction pressure ranges from 20 to 65 barg, offering flexibility to meet various operational requirements.
  • DISCHARGE PRESSURE: 85 barg:
    The discharge pressure reaches up to 85 barg and supports an operating range from 50 to 85 barg, ensuring efficient gas compression.
  • FLOW RATE: 700 Nm³/h
    With a flow rate of 4,800 Nm³/h, the system processes large volumes of gas efficiently and ensures reliable performance.
  • MOTOR POWER: 120 kW
    The motor with a power rating of 350 kW provides the necessary energy for high-performance and efficient operation, meeting high capacity and energy efficiency requirements.

Gib hier deine Überschrift ein