


Project Description
The transfer station is supplied with natural gas via the 70 bar long-distance gas network. The station feeds the 16 bar Premnitz-Summt supply network together with another station as the main feed-in.
The transfer station with associated components is integrated into one building. It is divided into the building sections measuring and control station, boiler house, E/I&C room and ancillary rooms for odorization, odor measurement, PGC and manual storage
The transfer station is designed with 2 rails for a capacity of 100,000 Nm³/h at an inlet pressure of 55 bar and an outlet pressure of 15 bar. The gas preheating is supplied via a boiler house with an output of 2 x 1.4 MW. In addition, two further 2-rail GDRM systems are integrated to supply the station boilers and a DP4 regional network.
Scope of supply
- Planning and tendering for the GDRM system
- On-site construction supervision during execution for the gas system, electrical and instrumentation technology and heat supply trades
CUSTOMER
NBB Network Company Berlin-Brandenburg